Planned expected settlement phenomena in the structure and required low embedment depths were the outstanding features of this project in Malaysia. On behalf of BayWa r.e., we supplied this landfill project with Sigma II frames. For this purpose, the frames were equipped with a flexible adjustment to compensate for medium-term subsidence phenomena.

Project name:Gebeng
Project CountryMalaysia
Capacity39 MWp 
Operation2018
Installation systemSigma II