Hristeni, Bulgaria, 121 MWp
The first large-scale European hybrid project combining a performance-optimized fixed-tilt system with a yield-optimized single-axis tracking system on very difficult terrain.
Werk 4 - A new era begins Read more
The first large-scale European hybrid project combining a performance-optimized fixed-tilt system with a yield-optimized single-axis tracking system on very difficult terrain.
MSY Group has delivered and implemented the next challenging project in Germany. With more than 12° tilt angle, our Sigma II has once again proven to be one of the most adaptable, flexible and competitive PV substructure solution.
Project of the Month - MSY Group delivered the next interesting project to our partner Belectric in the Netherlands. Difficult ground and environmental conditions made our Sigma II the best possible solution for this project.
With a total capacity of 66 MWp, it is the largest solar tracker project in Southeast Europe and the first for an IPP.
Planned, expected settlement phenomena in the building and the required low embedment depths were the outstanding features of this project in Malaysia. On behalf of BayWa r.e., we supplied this landfill project with Sigma II frames.
For this purpose, the frames were equipped with a flexible adjustment to compensate for medium-term subsidence phenomena.
The development of sustainability arises from renewable energy, which plays an important role, not only to promote an ecological culture, but also to use natural sources such as wind, sun and water, without compromising the well-being of the environment in any way.
multiwatt® Energiesysteme GmbH has been working successfully with Mounting Systems GmbH from Rangsdorf since 2011. We distribute all product ranges of Mounting Systems GmbH and can therefore offer our customers a full range, for almost all mounting requirements…
“This year, we have once again expanded and extended our long-standing cooperation with Mounting Systems. In addition to good product quality and excellent customer service, Mounting Systems scores with strong delivery reliability…
The Boguslav solar park is located in the Kiev region of Central Ukraine. We supplied this project with our Sigma II mounting system.
The harsh environmental conditions in particular were incorporated into the design for a long service life.
Mounting Systems supplied the first Egyptian solar power plant with the second generation Sigma Tracker system as part of the world-renowned project in Benban. In cooperation with ib Vogt, Mounting Systems was able to demonstrate its role as a global system supplier.
The experience gained in this way flowed sustainably into our engineering team and is now also available to all other partners.