Self-Locking Scissor Jack

121 MWp
Hristeni, Bulgaria

News Company

Large-Scale Hybrid Project

08.08.2023

The first large-scale European hybrid project combining a performance-optimized fixed-tilt system with a yield-optimized single-axis tracking system on very difficult terrain.

Project nameHristeni
Project locationBulgaria
PV capacity121 MWp 
Commissioning2023
Frame systemSigma Tracker + Sigma II

Contact us

back to top