Only 10 days left until Werk4 is opening. Read more

Forum New Energy World 2021 in Berlin

Forum New Energy World 2021
in Berlin

News Solar Parks & Utility-Scale

Forum New Energy World 2021 in Berlin

10.09.2021

It's that time again: The annual Forum Neue Energiewelt conference is just around the corner. The two-day event, organized by Conexio-PSE, will take place on September 22 and 23, 2021 at Festsaal Kreuzberg in Berlin, Germany.

The program includes networking, moderated discussions, pitches and presentations on a wide range of current topics related to renewable energy and the energy transition. The focus will be on topics such as photovoltaics, storage systems, green hydrogen, renewable energy policy and other current developments in the market.

Forum Neue Energiewelt MSY_DE

Continuation for last year's successc

After the successful first staging last year at the new location in Kreuzberg, the conference can physically take place again at the same venue. This is made possible by a strict hygiene concept that Conexio-PSE created and coordinated with the location and the authorities.

In addition, this year's event offers a new feature that allows digital participation via video stream. This has enabled Conexio-PSE to guarantee from the outset that the conference will take place despite possible short-term restrictions due to the unpredictable Corona situation.

Mounting Systems present as "Gold Sponsor"

As last year, Mounting Systems will be present at this year's 22nd edition as a gold sponsor. Our colleagues from the business unit "Solar Parks and Utility-Scale Projects" are looking forward to welcoming you at our booth for an exchange with other industry colleagues.

Join the event and come by to learn more about our fixed-tilt and solar tracker systems for photovoltaic installations. We are looking forward to your visit!

About the New Energy World Forum

For more than 20 years, the annual conference Forum Neue Energiewelt has been the most important meeting place for innovative companies seeking insights and ideas for a successful energy transition. In addition to presentations and discussions, the focus is on exchanging ideas and making new contacts. The conference offers a unique opportunity to get in touch with all the key players in the energy industry and discuss the relevant topics and challenges.

For more information about the event please click here.

Join the conference and order tickets here.

Mounting Systems – More than a system. It’s a brand.

Mounting systems for the largest solar carport in the world

Forum New Energy World 2021
in Berlin

News Solar Parks & Utility-Scale

Mounting systems for the largest solar carport in the world

08.06.2021

Mounting Systems has developed its Sigma Carport solution for the world's first 35 MWp solar carport park supplied by Solarfields and Lowlandsin Biddinghuizen, the Netherlands. The solar park is being built on the Lowlands parking lots next to the MOJO open-air festival site and covers an area of 35 hectares. A total of 90,000 bifacial solar modules will generate 35 MWp of energy, equivalent to the electricity consumption of 10,000 households per year or 100 festival weekends. Currently, the parking lot is used by at least four major festivals from May through October. The annual carbon emissions avoided are 18,410,000 kg.

Mounting Systems has supplied its Sigma Carport solution for the world's first 35 MWp solar carport park at Solarfields and Lowlands in Biddinghuizen, the Netherlands. The solar park is being built on the Lowlands parking lots next to the MOJO open-air festival site and covers an area of 35 hectares. A total of 90,000 bifacial solar modules will generate 35 MWp of energy, equivalent to the electricity consumption of 10,000 households per year or 100 festival weekends. Currently, the parking lot is used by at least four major festivals from May through October. The annual carbon emissions avoided are 18.410.000 kg.

Steel structures on a sturdy foundation

After a thorough assessment of the ground conditions, 2,770 special concrete foundation piles, each five meters long and weighing three tons, were driven into the ground. Once a stable foundation had been created, the steel systems were installed. Depending on the application, three different types of steel structures were assembled from standardized components - two structures for one car with three PV modules vertically and one structure for two cars (facing each other) with five PV modules vertically. The hot-dip galvanized structures in combination with the robust concrete foundations guarantee a solid and reliable carport system for more than 25 years.

Mounting Systems – More than a system. It’s a brand.

Gebeng, Malaysia, 39 MWp

Forum New Energy World 2021
in Berlin

Geplant erwartete Setzungserscheinungen im Baukörper und geforderte geringe Einbindetiefen waren die herausragenden Merkmale dieses Projektes in Malaysia. Im Auftrag der BayWa r.e. haben wir dieses Deponieprojekt mit Sigma II Gestellen beliefert. Dazu wurden die Gestelle mit einer flexiblen Anpassung zum Ausgleich von mittelfristigen Senkungserscheinungen ausgestattet.

Projektname:Gebeng
ProjektlandMalaysia
Kapazität39 MWp 
Betrieb2018
InstallationssystemSigma II

Wollen Sie mehr über das Projekt erfahren?

Contact

Downloads

zum System

Volodarovka, Russia, 15 MWp

Forum New Energy World 2021
in Berlin

Zusammen mit unserem österreichischen Partner der LSG Solar Solutions haben wir insgesamt neun Solarkraftwerke mit einer Gesamtkapazität von 135 MWp in der Russischen Föderation gebaut. Besonders die harten Umgebungsbedingungen waren hier ein maßgebliches Designkriterium. Darüber hinaus konnten wir unsere globale Leistungsfähigkeit durch den Beitrag von 100% lokaler Wertschöpfung beweisen.

Projektname:Akadyr II 
ProjektlandKasachstan
Kapazität26 MWp 
Betrieb2020 
InstallationssystemSigma II Bifacial

Wollen Sie mehr über das Projekt erfahren?

Contact

Download System

zum SystemLink

Ground Mount Systems for an 18 MWp PV Plant in Germany

Forum New Energy World 2021
in Berlin

News Solar Parks & Utility-Scale

Ground Mount Systems for an 18 MWp PV Plant in Germany

07.04.2021

Mounting Systems has delivered two-post ground mount systems for a photovoltaic plant, located in eastern Germany, approximately 60 km from the capital, Berlin.

A total of around 541 tons of assembly material was delivered by trucks directly to the construction site. Deliveries were made in stages to ensure a smooth and organized construction process at the site.

The foundation method chosen for the project was driven piles, which were driven to a embedment depth of 1.50m. The Sigma II system was adapted for a module inclination of 17°, and 40.320 PV modules were installed using module clamps. The PV system has an electrical DC capacity of 18 MWp.

Mounting Systems – More than a system. It’s a brand.

PV-Anlage

Boguslav, Ukraine, 54 MWp

Forum New Energy World 2021
in Berlin

Die Solaranlage Boguslav befindet sich in der Region Kiew in der Zentralukraine. Die Anlage, die 61 GWp Energie pro Jahr umgewandelt und 27.000 Tausend Haushalte mit Strom versorgen wird, wurde mit unserem anpassungsfähigen Sigma II PV-Montagesystem realisiert. Darüber hinaus können jährlich dank des Solarparks 24.000 Tonnen Kohlendioxid-Emissionen vermieden werden. Unser Projektpartner Scatec Solar betreibt, wartet und verwaltet die Anlage. 

Mounting Systems project Ukraine
Projektname:Boguslav
ProjektlandUkraine
Kapazität54 MWp
Betrieb2020
InstallationssystemSigma II

Wollen Sie mehr über das Projekt erfahren?

Contact

Download System

zum SystemLink

Benban, Egypt, 130 MWp

Forum New Energy World 2021
in Berlin

Mounting Systems hat das erste ägyptische Solartracker-Projekt in Benban mit dem Sigma Tracker System der zweiten Generation beliefert. In Kooperation mit ib vogt haben die beiden Berliner Unternehmen einen Projektumfang von 130 MWp bzw. 1.500 Sigma Tracker Systeme installiert. Der Sigma Tracker wurde für den Einsatz unter extremen Umweltbedingungen entwickelt und wird aus diesem Grund für Projekte wie das in Benban ausgewählt. Die technischen Vorteile des Tracker-Systems zeigen sich insbesondere in Bezug auf Langlebigkeit, dem Einsatz von Standard-Industriekomponenten und in der Einfachheit der Installation.

Mounting Systems Benban project
Projektname:Benban I, II & III
ProjektlandÄgypten
Kapazität130 MWp
Betrieb2017/2018
InstallationssystemSigma Tracker

Wollen Sie mehr über das Projekt erfahren?

Contact

Download System

zum SystemLink

Goussaincourt, France, 36 MWp

Forum New Energy World 2021
in Berlin

In Goussaincourt, Frankreich, lieferte Mounting Systems die Sigma II -Installationssysteme für ein Projekt, das in Zusammenarbeit mit Bouygues ES gebaut wurde. Auf Grund des harten Untergrunds, wurde unser Sigma II ausgesucht, da es mit seinem höhenverstellbaren geteiltem Pfosten perfekt geeignet war. Dies und der relative kleine Querschnitt der Pfosten ermöglichten schnelles und effizientes Vorbohren. Mehr als 18.000 Bohrlöcher, die mit dem Aushub wieder verfüllt wurden um die Pfosten zu rammen, wurden so in weniger als 3 Monaten eingebracht.

The racking systems for approx. 36 MWp were delivered by us within four weeks. Therefore, the efficiency of our logistics was of outstanding importance.

Sigma II project Goussaincourt
Projektname:Goussaincourt
ProjektlandFrankreich
Kapazität36 MWp
Betrieb2020/2021
InstallationssystemSigma II

Wollen Sie mehr über das Projekt erfahren?

Contact

Download System

zum System

Akadyr, Kazakhstan, 26 MWp

Forum New Energy World 2021
in Berlin

Mounting Systems lieferte das hoch anpassungsfähige und aus Stahl gefertigte Sigma II Bifacial Freilandsystem für einen Solarpark der GOLDBECK SOLAR GmbH in Kasachstan. Das Besondere an dem Akadyr II Projekt war, dass bifaziale Module zusammen mit dem bifazial-optimierten Montagesystem eingesetzt wurden, die einen maximalen bifazialen Zugewinn garantieren. Die bifazialen Unterstrukturen, der hohe Neigungswinkel und die große Bodenfreiheit sorgten dafür, dass Verschattungseffekte auf der Rückseite der Module vermieden werden konnten. 

Projektname:Akadyr II 
ProjektlandKasachstan
Kapazität26 MWp 
Betrieb2020 
InstallationssystemSigma II Bifacial

Wollen Sie mehr über das Projekt erfahren?

Contact

Download System

zum SystemLink

Sigma II ground mount project grid connected in Ukraine

Forum New Energy World 2021
in Berlin

News Solar Parks & Utility-Scale

Sigma II ground mount project grid connected in Ukraine

07.01.2021

The year 2021 got off to a perfect start in terms of Mounting Systems' outdoor projects. On January 1, 2021, the Kamianka project in central Ukraine was completed and put into operation. The 32 MWp photovoltaic plant was built in cooperation with the project partner Scatec errichtet.

Kamianka solarpark

The expected annual energy yield is about 37 GWh, and the solar plant will supply more than 11,000 households with green electricity. In addition, CO2 emissions will be reduced by more than 15,000 tons. For the Kamianka project, Mounting Systems supplied its robust and adaptable Sigma II two-post mounting systems, further strengthening its outdoor portfolio.

Mounting Systems – More than a system. It’s a brand.

back to top